b'Specifyrequiredproductlengthbyselecting 22lengthofcontinuousthreadedrodandstandardproductassembledlengthsexceeding includes hardware.20 long.PA-LWP Stampedsteelwallplatethat9. Torque Anchor Specifications: The Torque measures 12 x 26Anchorassemblywillconsistofproducts The anchors shall be mounted along the wall onselectedfromtheStandardProductSelection 5 feet on center at a distance of 3 feet from thenear the beginning of Chapter 1. top of the basement wall. (Two feet below soil TAF-150-84 10-12 1-1/2 solid square bar level)lead section with a 10 and a 12 diameter The anchors shall be angled down at 15 0 .Theplate attached to a standard 7-0 long shaft tiebackmustbeinstalledtoaminimumshaftlength. length of 20 feet TAE-150-60 extension5 extension bar & Averageinstallationtorqueof2,200ft-lborhardwarearespecifiedforeaseof greater is required for a minimum distance of atinstallation in the basement. (4-9 effective least 3 feet embedding 17 feet of length of shaft.length). Minimum of three 5 foot extensions Otherwisetheanchormustbedrivendeeperare required. usingadditionalextensionsectionsuntiltheThe assembled lengththeTorqueAnchortorque requirement is satisfied.tieback assembly is 21-1/4 feet. Thedesignspecificationsareshownonthe TAT-150 LightDutyTransitionthat sketch below.connects from 1-1/2 square anchor bar to a End of Example 3T = 22,050 lbECP TAF-150-60 (10,12) UCRITICAL TORQUE ANCHOR SOILDEPTH = INSTALLATION HEIGHT6 ft ANGLE TIEBACK 7\'-0"PLACEMENTLARGEST 3\'-0" FROMHELICAL TOP OF WALL &PLATE == 15 deg. HORIZONTALLY12" DIA. P = 2,205 lb/ft AT 5 ft. O.C.HREQUIRED MIN. STIFF TOADDITIONAL VERY STIFFEMBEDMENT CLAY (CL)LENGTH AFTERREACHING Lo = MINIMUM HORIZONTAL2,200 ft-lb = EMBEDMENT = 17 ft3 X 12" = 3 ft.NGTH = 17.6 ftEMBEDMENT LE TH REQUIREDPR L= 17.6 ft + 2.5 ft (USE 20 ft)ODUCT LENGResults for Tieback Design Example 3.ECP Technical Design ManualTorque Anchor Design Examples2021 Earth Contact Products, L.L.C.2021-09 Chapter 5Page 91 All rights reserved'