#FeaturedJobFriday: 134-Year-Old Brick Sewer Outflow System Repair
Posted: November 16, 2018 Author: Editorial Team
Sewer Outflow Rehabilitation: Atlas Systems of New England The City of Springfield, Massachusetts initiated the Connecticut River Combined Sewer Outflow (CSO) Rehabilitation Project. This was prompted by the dire disrepair of a 134-year-old brick sewer outflow system and headwall. The project called for the removal of the headwall and relining the brick sewer pipe. Because the…