The patented ECP Model 300 steel piering system is the standard in underpinning. Our design and engineering allows this ECP push pier technology to structurally underpin foundations down to a true load bearing stratum. The steel pier design penetrates the soil deeply, beyond expansive or active soils, to support structures from either the interior or exterior of the foundation. ECP, the leaders in steel piering technologies, is known for the strongest and deepest driving pier systems available.
The ECP Model 300 steel pier provides a two-stage system of driving steel pilings to a verified bearing stratum. Upon reaching this load bearing soil our unique hydraulic manifold lifting system can then recover lost elevation or provide a precise stabilization of structures.
The ECP Model 300 steel pier, like other resistance piers, is an end-bearing pier that does not rely upon nor requires skin friction to produce support. Each pier is field load tested after it is installed. The piers are able to develop a factor of safety because the piers are installed and load tested individually using the maximum weight of the structure as the reaction force. The ability of the system to develop significant factors of safety comes from the different methods used between pier installation and load transfer during restoration.
The piers are driven individually and the entire structure works as the reaction. A friction reduction collar is attached to the lead section of pier pipe. The purpose of the collar is to create an opening in the soil that has a larger diameter than the pier pipe. This dramatically reduces the skin friction on the pier pipe as it is driven into the soil and allows the installer to load test and verify that the pier encountered firm bearing stratum or rock that is suitable to support the design load. During load transfer, high pressure hydraulic jacks are placed at multiple locations, and connected to a hydraulic manifold, thus reducing the load on each pier to only the design working load.
• Ultimate Capacity – 79,000 lb
• Maximum Field Test Load – 59,000 lb
• 68 Square Inches Bearing Surface
• Standard Lift – 4”
• Fully Adjustable Unlimited Lift Capability
• Installs From Outside or Inside Structure
• Friction Reduction Collar On Lead Pier Section
• 2-7/8”Diameter High Strength, Galvanized Tubular Pier
• Installs With Portable Equipment
• Installed With Little or No Vibration
• Installs To Rock or Verified Load Bearing Stratum
• 100% of Piers Field Load Tested During Installation
• Manufacturer's Warranty
The capacity of the Model 300 foundation support system is a function of the capacity of pier pipe and soil surrounding the pipe, capacity of the load bearing stratum, foundation bracket, foundation strength and strength of the bracket to foundation connection. Actual capacities could be lower than the bracket capacity.